Compliance & certification
- Dubai Municipality DM-PH-NA-S04 alignment
- Engineer's project handover certificate
- Photo + GPS-tagged record of treatment
PCAT is the single most cost-effective termite intervention for any UAE villa or low-rise. We apply Termidor SC or Premise 200 to the substrate before concrete pouring — saturating soil under and around the slab so subterranean termites cannot reach the structure. This one-time treatment lasts 8–10 years and is a fraction of the cost of post-construction remediation.

A documented, audit-ready programme. Every visit logged, every protocol tied to UAE regulator requirements.
One-time application during construction; renewed at 8 years
AED 4–6 / sq ft of foundation footprint
The species we deal with most in pre-construction sites — each with its own protocol, prep instructions and warranty.
The questions pre-construction sites operators ask before signing a service contract.
Free quote in 30 minutes. Same-day visits across Dubai, Sharjah, Abu Dhabi & every other emirate.